Rhine bridge Neuss-Düsseldorf closed for trucks > 7.5 t
Since 11 October 2024, the Josef-Kardinal-Frings Bridge has been closed for trucks over 7.5 t. As a result, bypassing the bridge will take more time and incur higher costs.
Further details and information on the effects can be found in the PDF
Information on the Rhine bridge between Neuss and Düsseldorf.
Optimodal Nederland B.V.
Rotterdam, 05.11.2024